Difference between revisions of "Talk:Main Page"

From vjmedia
(It's serious http://kteed.com/spy-mobile-free-for-android/ cell spy now crack free download ag NuScale's 45-megawatt reactor, which can be grouped withothers to form a utility-scale plant, would sit)
(Blanked the page)
 
Line 1: Line 1:
It's serious http://kteed.com/spy-mobile-free-for-android/ cell spy now crack free download ag  NuScale's 45-megawatt reactor, which can be grouped withothers to form a utility-scale plant, would sit in a 5million-gallon pool of water underground. That means it needs nopumps to inject water to cool it in an emergency - an issueHopkins said was highlighted by Japan's crippled Fukushimaplant.
+
 

Latest revision as of 13:45, 17 October 2014